top of page

Apple Campus 2

Installation of (4) traffic signals, (2) lighted crosswalks, (4600) street lights, sports court lighting, and their entire exterior WiFI system. Contract amount $25M+.  Completed 2017

Bay View Campus

We installed deep and shallow utilities, street lighting, and temporary power.  Contract $4.5M Completed 2019.

TraPac Terminal Redevelopment

Installation of conduit infrastructure for truck scales, high mast lighting, and switch gear. Contract amount $4.5M. Completed  2017

SFO Long Term Park C&D

Installation of joint trench, street lights, bus shelters, and re-routed electrical infrastructure. Contract $1.2M.  Completed in 2017

UCSF Mission Bay 2nd Parcel Improvements

Installation of duct infrastructure, a fiber optic network, street lighting, card readers, code blue call boxes, and joint trench. Contract $3.7M.  Completed 2018

State Route 237 Express Lane Phase 2

Installation of Caltrans toll infrastructure, median lighting, bored 5 miles of conduit, and over (50) transformers installations. Contract $5.3M.  Completed 2018

#04-297624 Route 84 Widening

Installation of (4) temporary signals and street lighting, (4) new traffic signals, re-routed joint trench, and installed 4 miles of fiber. Completed 2018 Contract $2.8M.

Big Horn Boulevard

Installation of joint trench at a depth of 20’. Contract $1.8M Completed 2018.

bottom of page