Apple Campus 2
Installation of (4) traffic signals, (2) lighted crosswalks, (4600) street lights, sports court lighting, and their entire exterior WiFI system. Contract amount $25M+. Completed 2017
Bay View Campus
We installed deep and shallow utilities, street lighting, and temporary power. Contract $4.5M Completed 2019.
TraPac Terminal Redevelopment
Installation of conduit infrastructure for truck scales, high mast lighting, and switch gear. Contract amount $4.5M. Completed 2017
SFO Long Term Park C&D
Installation of joint trench, street lights, bus shelters, and re-routed electrical infrastructure. Contract $1.2M. Completed in 2017
UCSF Mission Bay 2nd Parcel Improvements
Installation of duct infrastructure, a fiber optic network, street lighting, card readers, code blue call boxes, and joint trench. Contract $3.7M. Completed 2018
State Route 237 Express Lane Phase 2
Installation of Caltrans toll infrastructure, median lighting, bored 5 miles of conduit, and over (50) transformers installations. Contract $5.3M. Completed 2018
#04-297624 Route 84 Widening
Installation of (4) temporary signals and street lighting, (4) new traffic signals, re-routed joint trench, and installed 4 miles of fiber. Completed 2018 Contract $2.8M.
Big Horn Boulevard
Installation of joint trench at a depth of 20’. Contract $1.8M Completed 2018.